
Panels and inverters: what the datasheet claims, and what the roof returns.
72 articles in the Journal · Page 1 of 6
Clear filtersStart with your site's export arrangement before selecting DC-coupled storage. Battery capacity also needs to suit the solar surplus available and the household demand it could supply.
Have removal and disposal priced in your solar replacement quote. Ask where the old panels will go and whether transport is included before accepting the total.
Read the articleWestern Power's notice required payment and complete project details at lodgement. It also specified new commissioning paperwork for projects already underway.
Read the articleCheck the proposed grid connection and your lease before sizing solar for a commercial roof. Export restrictions and landlord approval can affect which installation fits the site.
Read the articleA package quote needs to account for your roof and switchboard. Ask for installation extras in writing, and check the rebate assumptions and export pathway before paying a deposit.
Read the articleIf a supplier cites US tariffs to justify a higher solar price, ask how they affect the equipment being quoted. Request installation costs separately so you can compare the full price.
Read the articleYour existing inverter and solar output help determine the retrofit path. Check equipment compatibility and the circuits you want backed up before deciding what to keep or replace.
Read the articleEligible mid-scale solar installed from 1 October 2026 can access the expanded SRES. STC applications are expected in mid-to-late November; network approval and site-specific eligibility remain separate checks.
Read the articleENF Solar has published its Field Tested episode on the Aiko Neostar 3P and 3S, with PSW Energy founder Derek McKercher among the installers in it.
Read the articleCompare the NeoStar 3S+ and 3P on roof-space needs and panel construction, checking the warranty terms alongside the datasheet before choosing.
Read the articlePSW Energy visited GoodWe’s Suzhou headquarters and a manufacturing facility in China. The team saw the building’s own energy systems and watched inverter and battery production.
Read the articleCompare the export credits on your Synergy bill with your system’s recorded exports. Confirm current DEBS rates and eligibility with Synergy before relying on projected savings.
Read the article