In this article
An older solar system can be generating today and still need work before it’s safe to reconnect after a roof job or a battery upgrade. The decision comes down to what the electrician finds, how much of the array can stay and who will stand behind the finished work.
Keep, refit or replace
The case for keeping your panels
Start with recent production, the equipment details and the service history. A fault or a drop in output can come from the inverter, shading or another part of the system. Ask a licensed electrical contractor to assess the panels, wiring and mounting and tell you what they can retain.
Derek McKercher uses about five years as a guide at PSW. He tends to find fewer problems in newer arrays. An older system gets a closer look because ageing parts and the work needed to retain them can change the quote. The decision still comes down to inspection, testing and compatibility at that home.
An older array with a new battery
Adding a battery can leave the panels and mounting in place. When a compatible battery-capable inverter is fitted, WA’s existing-array guidance calls for the contractor to verify the older array is safe and compatible and assess any repairs or alterations it needs. Ask what can stay and get the scope in writing. See the battery retrofit comparison for the different ways this can work.
The fault the old inverter missed
On one job, PSW kept the existing panels and connected the array to a new inverter. The old inverter had been running with a fault in one string. The new inverter detected it and would not run the array. The customer expected a working system, and the team now had to establish what needed fixing in the original installation. That job is one reason Derek wants the existing array checked before PSW agrees to retain it.
Derek McKercher, electrician, founder, and director
Before accepting a battery quote, ask what happens if testing uncovers a fault in the existing array. Get clear on what the price covers, how extra repairs would be approved, and what the installer will cover under warranty.
Whole-site compliance in WA
Since 1 May 2026, new or upgraded solar and battery systems on WA’s South West Interconnected System have had to meet updated connection and communications requirements. A battery upgrade can bring an existing solar inverter into the assessment. Where remote management applies, Synergy’s requirements cover the relevant inverters across the site. The installer needs to show how the existing solar can be managed alongside the new equipment.
The inverter is where the output is controlled. Sound panels may be able to stay on a compatible new hybrid inverter. If the original solar inverter is staying, the installer may be able to use direct communication or a supported gateway, depending on the exact equipment and connection requirements. Ask how each inverter in your quote will be managed.
In Derek’s experience, adding a third-party gateway can add a couple of thousand dollars once the hardware, integration and commissioning are included. It also adds another device and communication link for the installer to support. If retaining the older array takes that extra work as well as electrical repairs, compare its installed cost and support with a new system that controls the solar and battery together. When the totals are close, Derek favours the simpler setup and the warranties that come with new equipment.

A roof job changes the maths
Taking panels off for a roof restoration means paying for removal and then paying again to get solar back on the roof. Derek’s team has found that old fixings can seize, cable runs may need replacing and connector seals can deteriorate. PSW generally declines to remove and refit older arrays because of the condition of those parts and the difficulty of standing behind the finished work.
Compare complete prices for refitting and replacing the system. A new system may come close once you account for new mounting, cabling and labour on a refit. An eligible new system can attract small-scale technology certificates. Ask whether the replacement quote includes that discount and what the new equipment and workmanship warranties cover.
- Removal. Electrical disconnection, roof access and lifting. Confirm who makes the roof weatherproof after the panels come off.
- Refitting. Storage, replacement parts, electrical work, testing and any approvals the installer needs to check.
- Retirement. Loading, transport and facility fees for the panels you’re taking out of service.
Coordinate dates with the roofer and use a licensed electrical contractor. Solar wiring can remain live in daylight, so leave disconnection and reconnection to the contractor.
Where the old panels go
Have the installer name the receiver and include transport and handling in the quote. If it plans to send working panels for reuse, ask who will assess them and where they will go. If the panels are being recycled, ask who will accept them in their current condition and whether you can get a receipt.
Facilities can have different acceptance rules for damaged panels and commercial loads. If you’re organising disposal, confirm the material, condition, quantity and fee with the receiver before making the trip. Cyber Recycling lists a Perth collection service. Confirm whether it can take your household load and what it charges before booking.
WA collection plans
The WA Government has allocated $13 million through Remade in WA to develop end-of-life solar panel collection and recycling. Its published update describes baseline work to understand how panels are handled across the state. Organise the receiving facility and costs for your job before the panels come down.
In November 2026, the federal department reported that it had cancelled the procurement for a National Solar Panel Recycling Pilot administrator without awarding a contract. It is considering the pilot’s next steps.
Sources and further reading
References checked 20 November 2026.
- Building and Energy WA · Existing PV arrays when adding batteries
- Building and Energy WA · Solar PV electrical safety
- Energy Policy WA · Requirements for new and upgraded solar and batteries
- Western Power · Basic embedded generator connection requirements
- Synergy · Supported solutions and whole-of-site compliance
- Clean Energy Regulator · Replacing existing solar PV systems
- WA Government · Remade in WA solar panel recovery
- DCCEEW · National Solar Panel Recycling Pilot update