Skip to content
PSW Energy
PSW Energy

Menu.

Search PSW Energy

PSW Journal

PSW Energy’s Neerabup depot in Perth’s north

PSW Energy and Perth Solar Warehouse share the Neerabup depot for northern dispatch and customer service, alongside the southern base at Bibra Lake.

The Neerabup depot: PSW Energy's second base, north of the river
In this article

PSW Energy and Perth Solar Warehouse now operate from Bibra Lake and 1/42 Pinnacle Drive, Neerabup. Announced in September 2025, the northern depot is open and supports jobs north of the river.

In short

  • The second depot is at 1/42 Pinnacle Drive, Neerabup — announced September 2025, now open.
  • One building, both brands: Perth Solar Warehouse and PSW Energy operate from the same warehouse and counter.
  • It is a working depot, not a shopfront — stock, dispatch and customer service for jobs north of the river.
  • We have committed to the site for an initial ten years. It is not a pop-up.

Northern dispatch from Neerabup

For years every panel, inverter and battery we installed left Bibra Lake, whatever side of the city the job was on. For a job in Joondalup, Alkimos, Yanchep or Two Rocks, that meant a truck crossing the whole metro area before the first tile came off — crew hours spent on the freeway instead of on a roof.

Neerabup is off Wanneroo Road in the northern industrial corridor. Stock and crews for northern jobs can leave from there, reducing travel across Perth.

Warehouse and customer service

The site does two jobs from one building. It is a distribution warehouse — the solar, battery and EV charging equipment for northern installs is racked and dispatched there — and it is a customer service base, so support for northern customers is handled by people working from the same postcode, not relayed from the other end of the city.

Bibra Lake remains the head office and showroom. The north just stopped being the far end of the run.

Work beyond Perth

The depot is also the staging point for work beyond the northern suburbs. Jobs up the coast and inland from the northern edge of the metro area load out of Neerabup rather than Bibra Lake, which is the difference between a regional job being routine and being a logistics exercise.

Visiting

For sales, support or accounts details, use the contact page. For a system designed around your roof and switchboard, get a quote.

The original announcement is archived on the Perth Solar Warehouse and McKercher Corporation sites.

Keep the picture growing.

Explore the PSW Journal

Nicole Bilman appointed CEO of PSW Energy

PSW EditorialRead the article

Make the next step yours.

Start with your home, your routines and what you want to change.

Build my energy plan

Build the system around your home.

Choose the starting point, add products and carry one coherent plan into a written quote.

Build my energy plan