Three things to have in writing
- Where will it go?
A roof plan, equipment locations and an estimate for your home.
- What’s refundable?
The design fee, what it covers and when you can get it back.
- What did we agree to?
A copy of the contract and any changes you and the seller have accepted.
A quote built around your home
Look at the roof plan first. Check where the panels will sit, where the inverter and battery will go and which electrical work the price covers. If the system needs configuration or installation, the Code calls for a site-specific design and performance estimate. You can also agree to receive them as the first deliverables under your contract.
In Perth, it helps to see how much the system might produce in winter as well as summer. Ask what the estimate assumes about shading and, if you’ve been quoted a saving, how it accounts for when you use electricity. The updated rules on misleading claims cover conversations with the seller as well as advertising.
Design fees and when you can cancel
A custom design can carry its own fee. Check the amount, what you’ll get for it and when it’s refundable. Those terms belong in the quote.
If the system needs physical installation and the design and estimate are the first agreed deliverables, you have 10 business days from receiving them to tell the seller you don’t accept them and cancel. If the Code’s unsolicited-sale cooling-off period applies, the 10 days start after it ends. The seller can deduct applicable non-refundable fees disclosed under the Code.
If you’re handling network approval yourself and the application is refused after signing, clause 49 also lets you cancel. Check which disclosed fees and reasonable expenses the seller can deduct.

Changes before installation
Say the crew finds a roof vent where a panel was meant to go. Get the revised layout and check what the move does to the output or price. You and the seller need to legally accept the contract and amendments before installation. You can do that electronically. Save the version you agreed to.
For equipment that needs installation, clause 47 lets you end the contract if you decline a significant design change or the seller declines to cover extra work outside the agreed price arising from circumstances beyond its control. Applicable non-refundable fees may still be deducted.
Strata consent before you sign
Tell the seller the property is strata titled from the start. If the owners corporation’s written consent is required, obtain it and send it to the seller before signing.
If equipment is installed and required consent is later refused, removal and reinstatement costs can fall to you. Clause 50 addresses those costs. Ask the seller to confirm how consent and any costs would be handled before you commit.
What to keep at handover
Make one folder for the system. It’ll save you hunting for a serial number or a warranty contact later.
- Installation records. The final layout, system ratings, commissioning date and equipment locations.
- Equipment details. Model and serial numbers, manuals and warranty documents.
- Day-to-day use. Operating instructions, monitoring access if included, and the service contact.
Before the crew leaves, ask them to show you how to operate the system and find its monitoring if you have it.
Your seller is the first call
If something’s off, send the seller the agreed layout, a short description and any photos that help show the issue. The Approved Seller is responsible under the Code for people acting on its behalf, including subcontractors.
If the seller’s complaints process doesn’t resolve a Code issue, you or someone representing you can contact NETCC. Your Australian Consumer Law rights also apply.
Check your seller’s approval
Look up the business on your quote before signing. Sellers that opted out of the updated Code leave the program on 30 November 2026, so check again from 1 December if your purchase spans the change.
Vendors in the WA Residential Battery Scheme must be NETCC Approved Sellers and meet the scheme’s other requirements. Our NETCC guide for WA buyers explains what else to look for.